H. F. STEPHENS,
M.I.C.E.
|
|
EDUCATION
LIST OF WORKS,
AND
QUALIFICATIONS.
EDUCATION
|
| |
|
|
|
University College School, London |
1877-1883 |
. |
| With
Private Tutor |
1883-1994 |
. |
| Vitre
(Ile-et-Villaine) |
1884-1886 |
French, &c. |
| Carlesruhe
(Baden) |
1886-1887 |
German,
Mathematics, &c. |
| Matriculation,
London University |
1887 |
. |
| University
College, London |
1887-1888 |
Pupil, Sir A. W. B. Kennedy, Civil Engineering. |
| Workshops
and Loco Dept., Neasden Works |
1889-1890 |
Pupil,
J. J. Hanbury, Mechanical Engineering |
| |
|
|
|
LIST
OF WORKS.
(RAILWAYS AND WATERWAYS.)
WORKS
CONSTRUCTED
|
| |
|
Name
of Works.
|
Period.
|
Mileage.
M. F. C.
|
Remarks.
|
|
Paddock
Wood & Cranbrook Railway
|
1890-94
|
11
3 5
|
Resident
Engineer during construction. (Now worked and maintained by S.E.
& C.R.)
|
|
*Rye
& Camber Tramway (Steam)
|
1895
|
2
0 0
|
Engineer
and Locomotive Superintendent. Designed and equipped line, organised
traffic matters and worked line.
|
|
*Chichester
& Selsey Tram Road (Steam)
|
1897
|
8
0 0
|
Engineer
and Locomotive Superintendent. Designed and equipped line, organised
traffic matters and worked line.
|
|
*Rother
Valley Railway
(Now Kent & East Sussex Railway)
|
1898
|
12
0 4
|
Engineer,
Locomotive Superintendent, and Managing Director. Designed and
equipped line, organised traffic matters and worked line.
|
|
Sheppey
Railway
|
1900-02
|
8
5 0
|
Engineer.
(Now worked and maintained by S.E. & C.R.)
|
|
*Rolvenden
& Tenterden Railway
(Kent & East Sussex Railway)
|
1902
|
1
4 6
|
Engineer,
Locomotive Superintendent, and Managing Director. Designed and
equipped line, organised traffic matters and worked line.
|
|
*Kent
& East Sussex Railway, Tenterden to Headcorn extension
|
1903-04
|
7
6 9
|
Engineer,
Locomotive Superintendent, and Managing Director. Designed and
equipped line, organised traffic matters and worked line.
|
|
Bere
Alston & Calstock Railway
|
1904
|
4
1 8
|
Engineer
in conjunction with Messrs. Galbraith & Church, Locomotive Superintendent,
and Managing Director. Designed and equipped line, organised traffic
matters and worked line.
|
|
East
Cornwall Mineral Railway
(Reconstruction and conversion of gauge)
|
1904
|
6
0 0
|
Engineer
in conjunction with Messrs. Galbraith & Church, Locomotive Superintendent,
and Managing Director. Designed and equipped line, organised traffic
matters and worked line.
|
|
Burry
Port & Gwendraeth Valley Railway
|
1909
|
12
2 3
|
Engineer,
reconstructed and converted line from mineral to passenger.
|
|
*Shropshire
& Montgomeryshire Railway
|
1910-11
|
24
0 0
|
Railway
reconstructed. Engineer, Locomotive Superintendent, and Managing
Director. Designed and equipped line, organised traffic matters
and worked line.
|
|
*East
Kent Railway
|
1911-16
|
18
0 0
|
Engineer,
Locomotive Superintendent, and General Manager. Designed and equipped
line, organised traffic matters and worked line.
|
|
*Weston,
Clevedon & Portishead Railway
|
1911
|
14
0 0
|
Engineer,
Locomotive Superintendent, and General Manager.
|
|
Medway
Upper Navigation
(Maintenance and renewal)
|
1896-1901
|
16
0 0
|
Engineer.
(Number of Locks on River, 13.)
|
*Lines
worked and maintained.
Mileage of Railways constructed, 130 miles, at a cost of
£842,225.
Considerable experience re Parliamentary work, also organization of traffic
matters and the complete equipment of Railways with rolling stock and
stores.
At present responsible for a considerable number of standard and narrow gauge
engines, coaches, and trucks of various types; also other rolling stock,
with workshops, etc.
WORKS LOCATED AND DESIGNED.
|
Name
of Line.
|
Period.
|
Mileage.
M. F. C.
|
Remarks.
|
|
Tenterden
Railway (Parliamentary Line)
|
1894
|
31
5 9
|
Passed.
Charge of Survey and Sections.
|
|
Rother
Valley Railway (Parliamentary Line)
|
1895
|
12
1 3
|
Passed.
Sole Engineer.
|
|
Railways
under Act of 1896, &c. :-
|
|
|
|
|
Rye
& Camber Tramway (Steam)
|
1895
|
2
0 0
|
Sole
Engineer.
|
|
Gower
Railway
|
1896
|
13
6 6
|
Passed.
Sole Engineer.
|
|
Hadlow
Railway
|
1896
|
11
5 5
|
Passed.
Sole Engineer.
|
|
Central
Essex Railway
|
1897
|
27
5 1
|
Passed.
Sole Engineer.
|
|
Sheppey
Railway
|
1897
|
7
6 1
|
First
5 miles rejected subject to diversion, remainder passed. Sole Engineer.
|
|
Chichester
& Selsey Line (Steam)
|
1897
|
8
0 0
|
Sole
engineer.
|
|
Sheppey
Railway (Diversion)
|
1898
|
8
5 1
|
Passed.
Sole Engineer.
|
|
Cranbrook,
Tenterden & Ashford Railway
|
1898
|
21
0 2
|
First
9 m. 7 f. 1¾ c. passed, remainder rejected. Sole Engineer.
|
|
Kelvedon,
Coggeshall & Halstead Railway
|
1898
|
9
4 1
|
First
2¼ miles passed, remainder rejected. Sole Engineer.
|
|
St.
Just, Land's End & Great Western Junction Railway
|
1898
|
17
1 0
|
Rejected.
Sole Engineer.
|
|
Land's
End, St. Just & Great Western Junction Railway
|
1898
|
23
3 1
|
Rejected.
Sole Engineer.
|
|
Hedingham
& Long Melford Railway
|
1898
|
15
2 7
|
Rejected.
Sole Engineer.
|
|
Orpington,
Cudham & Tatsfield Railway
|
1898
|
7
6 8
|
Passed.
Sole Engineer.
|
|
Long
Melford & Hadleigh Railway
|
1899
|
15
0 9
|
Passed.
Sole Engineer.
|
|
Maidstone
& Faversham Junction Railway
|
1899
|
12
1 3
|
Passed.
Sole Engineer.
|
|
East
Sussex Railway
|
1899
|
7
2 8
|
Passed.
Sole Engineer.
|
|
Rother
Valley Railway Extension to Headcorn
|
1901
|
7
7 1
|
Passed.
Sole Engineer.
|
|
Surrey
& Sussex Railway
|
1902
|
25
5 6
|
Rejected.
Sole Engineer.
|
|
Maidstone
& Sittingbourne Railway
|
1904
|
11
1 6
|
Pending.
Sole Engineer.
|
|
Headcorn
& Maidstone Junction Railway
|
1906
|
10
0 8
|
Passed.
Sole Engineer.
|
|
North
Shropshire Railway
|
1907
|
24
0 0
|
Passed.
Sole Engineer.
|
|
Bere
Alston & Calstock Railway, North Hill Extension
|
1909
|
6
7 1
|
Passed.
Sole Engineer.
|
|
Burry
Port & Gwendraeth Valley Railway
|
1909
|
12
2 3
|
Passed.
Sole Engineer.
|
|
North
Devon & Cornwall Junction Rly.
|
1910
|
19
6 0
|
Passed.
Sole Engineer.
|
|
East
Kent Railways
|
1911
|
19
7 6
|
Passed.
Sole Engineer.
|
|
"
" " Extensions
|
1911
|
10
3 2
|
Passed.
Sole Engineer.
|
|
"
" " "
|
1912
|
5
2 1
|
Passed.
Sole Engineer.
|
|
Cadbury
Railway
|
1912
|
1
6 4
|
Pending.
Sole Engineer.
|
|
East
Kent Railways Extensions
|
1913
|
21
6 8
|
Pending.
Sole Engineer.
|
|
Gower
Railway
|
1913
|
13
6 6
|
Pending.
Joint Engineer.
|
|
East
Kent Railways Extensions
|
1914
|
7
4 9
|
Pending.
Sole Engineer.
|
|
West
Sussex Railway
|
1915
|
8
1 0
|
Passed.
Sole Engineer.
|
|
Edge
Hill Railway
|
1917
|
11
2 8
|
Passed
as regards 5 miles 5 furlongs 8 chains. Sole Engineer.
|
|
Ashover
Railway
|
1918
|
6
0 8
|
Pending.
Sole Engineer.
|
|
Shropshire
Railways (Shrewsbury & Market Drayton Extension)
|
1918
|
22
1 2
|
Pending.
Sole Engineer.
|
|
Siding
from L. & N. W. Rly. to Castner Kellner Alkali Co.'s Works,
Weston Point, Cheshire.
|
1918
|
0
7 6
|
Pending.
Sole Engineer.
|
Total
mileage of lines over 450; total estimates, £2,900,000.
Considerable
experience in locating, designing and working railways of economical construction.
Acted as Inspector to the Railway Department of the Board of Trade, under notice
of Accidents Act, 1894, for several years.
Admitted Student of Middle Temple, 1906.
General consulting work and reporting on various schemes, cases, &c., from
1890 to present date.
Has had special opportunities for acquiring knowledge of Government requirements
for the working of both heavy and Light Railways.
Member of the Institution of Civil Engineers.
Raised 600 men (Royal Engineers) for South African War.
Raised and commanded 2,400 men and 220 officers (Royal Engineers), in 1914 for
European War; mentioned in despatches 1916; returned to Railway Work 1916
with rank of Lieut.-Colonel Royal Engineers (T.R.)
Back
to The Life Of Colonel Stephens
Tom Burnham
has prepared this very useful addition to the website.

|